Welcome to SICOMA ZHUHAI CO., LTD.
News Center
The superiority of twin-shaft prefabricated mixer control
- Categories:twin-shaft prefabricated mixer
- Time of issue:2022-09-09
(Summary description)The twin-shaft prefabricated mixer's dual-machine control system has the characteristics of flexible control, easy operation, high weighing accuracy, and stable and reliable operation. The specific features of a Twin-shaft prefabricated mixer are as follows: 1. The Twin-shaft prefabricated mixer has two control modes: linkage and manual, and the two modes can be switched flexibly, it has a high degree of automation. The linkage process is: after starting the mixing motor of the mixing station, start the equipment, and start the cement weighing instrument and the water weighing instrument.
The superiority of twin-shaft prefabricated mixer control
(Summary description)The twin-shaft prefabricated mixer's dual-machine control system has the characteristics of flexible control, easy operation, high weighing accuracy, and stable and reliable operation. The specific features of a Twin-shaft prefabricated mixer are as follows:
1. The Twin-shaft prefabricated mixer has two control modes: linkage and manual, and the two modes can be switched flexibly, it has a high degree of automation. The linkage process is: after starting the mixing motor of the mixing station, start the equipment, and start the cement weighing instrument and the water weighing instrument.
- Categories:twin-shaft prefabricated mixer
- Time of issue:2022-09-09 11:02
- Views:
The twin-shaft prefabricated mixer's dual-machine control system has the characteristics of flexible control, easy operation, high weighing accuracy, and stable and reliable operation. The specific features of a Twin-shaft prefabricated mixer are as follows:
1. The Twin-shaft prefabricated mixer has two control modes: linkage and manual, and the two modes can be switched flexibly, it has a high degree of automation. The linkage process is: after starting the mixing motor of the mixing station, start the equipment, and start the cement weighing instrument and the water weighing instrument.
After reaching the upper limit, it automatically stops and unloads the aggregate to the mixer. Cement and water start to unload, and stop after unloading to zero. After the lifting bucket is unloaded, it will automatically descend (the pause time is adjustable). The operator observes the concrete mixing situation. After passing the qualification, press the unloading button of the concrete mixer to complete the linkage process of the Twin-shaft prefabricated mixer.
2. The electric box of the control system of the Twin-shaft prefabricated mixer has the function of preventing 2 water additions. The forced mixer can effectively avoid the phenomenon of adding water due to the sticking of the lifting hopper and the phenomenon of adding water when it is lifted again, so as to avoid the loss caused thereby.
3. The electric box of the control system of the Twin-shaft prefabricated mixer adopts an aluminum alloy etched panel, which makes the operation clear at a glance. The instrument of the mixing station adopts high-precision devices, with fast sampling and high weighing accuracy. Recipe input and instrument calibration are convenient.
Through the above introduction and analysis of the superiority of twin-shaft prefabricated mixer control, hope it helps you.
Scan the QR code to read on your phone
Relevant information
-
Unlocking the Secrets of High Performance Concrete Mixers
Discover the key factors that make a concrete mixer the best in terms of high performance. Dive into the world of manufacturing and processing machinery, specifically focusing on engineering and const - Top 10 Best High Performance Concrete Mixers for Construction Projects
- Enhancing Construction Efficiency with Quality High Performance Concrete Mixers
- The Secret to Durable and Efficient Concrete Mixing: High-Performance Mixer
- Maximizing Performance: The Importance of Quality High Performance Concrete Mixers
Contact Information
Hotline:0086+400-8870-883
Tel: 0086-0756-8910605
Fax: 0086-0756-8682101
E-mail: sicoma@sicoma.com.cn
Web:http://www.sicoma.com.cn/
Add:NO.7,Ping Gong Rd.(west),Nan Ping,Xiangzhou
District,ZhuHai,China
Subscription
Subscription
Copyright 2020 © SICOMA ZHUHAI CO., LTD
Powered by:www.300.cn 粤ICP备06047186号